by MsCichlid » Tue Sep 16, 2008 7:11 pm
Thanks! Let tell you about the process.
First, picking up the materials. In the meantime, I had to paint the room and put down new tile. I had the bar sink taken out and replaced with a utility.
The racks are based on shelves and 4 x 4 supports using lag bolts to hold it all together. I cut all the materials first then assembled the racks and painted them.
- Attachments
-

- DSC_0684.jpg (43.32 KiB) Viewed 3173 times
-

- 4-x-4-done.jpg (60.06 KiB) Viewed 3170 times